Thursday, March 29, 2012

Schedule Over Runs, Run Over

We're about 2 weeks past due on our Master Bath renovation, but it is FINALLY.....FINALLY, almost done.  It is looking really good now, too.  There is still wallpaper on the walls---with the construction materials in the bathroom I really haven't been able to get up there to get the remainder of the wallpaper removed.  It will probably happen next weekend, and then we'll have Kenny in to paint our bathroom, and the child's bedroom and bathroom at the same time.  The granite for the counters is in fabrication, and the shower door has been measured and is in process for installation tomorrow (yeah!!).

Here are our latest photos from the renovation:

The curved shower wall, done to the top and framed out with travertine bullnose:


This is the rear wall of the shower; on the tub side.  We used 18x18 Travertine, which looks really impressive, and there is a very large 36x36 diamond mosaic insert over the tub:


The mosaic Medallion, as seen from the bedroom:


A Close Up of the Mosaic Medallion:


The other shower wall, where the faucet will be mounted: