Friday, March 16, 2012

Putting It Back Together

Demo is completely done, and now it is time to take the shell and turn it back into a bathroom!  This first photo actually belongs earlier in the blog posting.  Joel put underlayment over the hardwoods in the hall to keep them safe, and it has worked wonderfully for keeping the upstairs reasonable clean during the renovation:


The new shower wall is built up with Hardi-backer, and mudded in to be ready for tile:


The shower floor has a brand new drain, membrane, and poured floor.  It looks so nice and smooth, just in its raw form:


New hardi-backer is on the bathroom floor, and it is all re-leveled and ready for the tile:


A wide angle shot (all the wallpaper remnant should go away this upcoming weekend):

Close Up of the Shower interior with the glass block window:


The floor area--the toilet drain is covered with a little hardi-backer scrap, that is what the little rectangle is.  We got rid of the Bidet entirely, and had the stub outs capped under the floor.  We'll be putting a linen cabinet there instead:

No comments:

Post a Comment